Logistic science pack — Factorio Production Calculator

Logistic science pack is crafted in the assembling machine in 6 seconds, producing 1 per craft from 1 × Inserter, 1 × Transport belt. At 60 per minute you need 12 assembling machines, and the chain behind it draws on 2 raw resources: iron ore, copper ore.

Production chain for 60 Logistic science pack / minute

ItemPer minuteMachinesMachine
Iron plate33017.6Furnace
Copper cable1801.5Assembling machine
Copper plate904.8Furnace
Iron gear wheel901.5Assembling machine
Logistic science pack6012Assembling machine
Inserter601Assembling machine
Electronic circuit601Assembling machine
Transport belt600.5Assembling machine

Raw materials

ResourcePer minute
Iron ore330
Copper ore90
Furnace 22.4
Assembling machine 17.5

Machine counts are not rounded up. Add a little headroom in game — belt throughput and inserter speed usually mean you want 5-10% more than the exact number.

Logistic science pack recipe

MachineCrafting timeOutputIngredients
Assembling machine6 s1Inserter × 1, Transport belt × 1

What the whole chain needs

60 logistic science packs per minute pulls in 7 intermediate products, and the whole tree comes to 40 machines across 2 machine types, fed by 2 raw resources. The table above already sums demand across every branch — if copper cable is used by two recipes, you see the total, not one of them.

Belt check: the busiest input here moves 330 per minute, which is 0.37 of a yellow belt's 900 per minute. Above 1.0 and you need a second belt (or a faster tier) before the machines themselves become the limit.

What uses logistic science pack

No base-game recipe consumes logistic science pack — it is an end product. Once you build it, the chain stops here, which makes it a good target if you only want to size the sub-factory that feeds your mall.

What logistic science pack is made from

FAQ

How many assembling machines do I need for 60 logistic science packs per minute?

12 assembling machines. One at standard speed produces 5 per minute, so 60 ÷ that number is the count. The calculator above rounds nothing — add 5-10% headroom for belt and inserter losses in a real factory.

How much raw ore does logistic science pack take?

At 60/min the chain consumes 330 iron ore per minute, 90 copper ore per minute. Those numbers are the theoretical minimum — mining productivity research and productivity modules both reduce them.

Machine counts assume bare machines at standard speed. Recipe data comes from the game's own prototypes (PlayerCalc, Factorio 2.0 base game). Not affiliated with Wube Software.