free · no download

Long-handed inserter — Factorio Production Calculator

Long-handed inserter is crafted in the assembling machine in 0.5 seconds, producing 1 per craft from 1 × Iron gear wheel, 1 × Iron plate, 1 × Inserter. At 60 per minute you need 1 assembling machine, and the chain behind it draws on 2 raw resources: iron ore, copper ore.

Production chain for 60 Long-handed inserter / minute

ItemPer minuteMachinesMachine
Iron plate42022.4Furnace
Copper cable1801.5Assembling machine
Iron gear wheel1202Assembling machine
Copper plate904.8Furnace
Long-handed inserter601Assembling machine
Inserter601Assembling machine
Electronic circuit601Assembling machine

Raw materials

ResourcePer minute
Iron ore420
Copper ore90
Furnace 27.2
Assembling machine 6.5

Machine counts are not rounded up. Add a little headroom in game — belt throughput and inserter speed usually mean you want 5-10% more than the exact number.

Long-handed inserter recipe

MachineCrafting timeOutputIngredients
Assembling machine0.5 s1Iron gear wheel × 1, Iron plate × 1, Inserter × 1

What the whole chain needs

60 long-handed inserters per minute pulls in 6 intermediate products, and the whole tree comes to 34 machines across 2 machine types, fed by 2 raw resources. The table above already sums demand across every branch — if copper cable is used by two recipes, you see the total, not one of them.

Belt check: the busiest input here moves 420 per minute, which is 0.47 of a yellow belt's 900 per minute. Above 1.0 and you need a second belt (or a faster tier) before the machines themselves become the limit.

What uses long-handed inserter

No base-game recipe consumes long-handed inserter — it is an end product. Once you build it, the chain stops here, which makes it a good target if you only want to size the sub-factory that feeds your mall.

What long-handed inserter is made from

FAQ

How many assembling machines do I need for 60 long-handed inserters per minute?

1 assembling machine. One at standard speed produces 60 per minute, so 60 ÷ that number is the count. The calculator above rounds nothing — add 5-10% headroom for belt and inserter losses in a real factory.

How much raw ore does long-handed inserter take?

At 60/min the chain consumes 420 iron ore per minute, 90 copper ore per minute. Those numbers are the theoretical minimum — mining productivity research and productivity modules both reduce them.

Machine counts assume bare machines at standard speed. Recipe data comes from the game's own prototypes (PlayerCalc, Factorio 2.0 base game). Not affiliated with Wube Software.