free · no download

Logistic robot — Factorio Production Calculator

Logistic robot is crafted in the assembling machine in 0.5 seconds, producing 1 per craft from 1 × Flying robot frame, 2 × Advanced circuit. At 60 per minute you need 1 assembling machine, and the chain behind it draws on 6 raw resources: water, petroleum gas, iron ore, copper ore, heavy oil, coal.

Production chain for 60 Logistic robot / minute

ItemPer minuteMachinesMachine
Sulfuric acid2,4000.8Chemical plant
Copper cable2,10017.5Assembling machine
Iron plate1,54882.56Furnace
Copper plate1,17062.4Furnace
Lubricant9001.5Chemical plant
Electronic circuit5409Assembling machine
Sulfur2402Chemical plant
Plastic bar2402Chemical plant
Steel plate12032Furnace
Pipe1202Assembling machine
Battery1208Chemical plant
Advanced circuit12024Assembling machine
Logistic robot601Assembling machine
Flying robot frame6040Assembling machine
Electric engine unit6020Assembling machine
Engine unit6020Assembling machine
Iron gear wheel601Assembling machine

Raw materials

ResourcePer minute
Water8,400
Petroleum gas6,000
Iron ore1,548
Copper ore1,170
Heavy oil900
Coal120
Chemical plant 14.3
Assembling machine 134.5
Furnace 177

Machine counts are not rounded up. Add a little headroom in game — belt throughput and inserter speed usually mean you want 5-10% more than the exact number.

Logistic robot recipe

MachineCrafting timeOutputIngredients
Assembling machine0.5 s1Flying robot frame × 1, Advanced circuit × 2

What the whole chain needs

60 logistic robots per minute pulls in 16 intermediate products, and the whole tree comes to 326 machines across 3 machine types, fed by 6 raw resources. The table above already sums demand across every branch — if copper cable is used by two recipes, you see the total, not one of them.

Belt check: the busiest input here moves 8,400 per minute, which is 9.33 of a yellow belt's 900 per minute. Above 1.0 and you need a second belt (or a faster tier) before the machines themselves become the limit.

What uses logistic robot

No base-game recipe consumes logistic robot — it is an end product. Once you build it, the chain stops here, which makes it a good target if you only want to size the sub-factory that feeds your mall.

What logistic robot is made from

FAQ

How many assembling machines do I need for 60 logistic robots per minute?

1 assembling machine. One at standard speed produces 60 per minute, so 60 ÷ that number is the count. The calculator above rounds nothing — add 5-10% headroom for belt and inserter losses in a real factory.

How much raw ore does logistic robot take?

At 60/min the chain consumes 8,400 water per minute, 6,000 petroleum gas per minute, 1,548 iron ore per minute and 3 more. Those numbers are the theoretical minimum — mining productivity research and productivity modules both reduce them.

Machine counts assume bare machines at standard speed. Recipe data comes from the game's own prototypes (PlayerCalc, Factorio 2.0 base game). Not affiliated with Wube Software.